17Jul/103.5 hrs

Began Fabricating Floor Inspection Covers

I started on the fabrication of inspection covers for the floor area around the control sticks and flap handle.  There are many cutouts to size and fit, so I'm only about half done with the covers now.  It's pretty challenging to get something that will slip into place without removing the flap handle or sticks and still seal up tight to the tubing and fittings in the area.  I've already ruined one cover and had to start over.