bearhawkproject.com Matt Kunkel's Bearhawk Build Log

19Jun/101 hr

Floorboard template, cable guards

Transferred the template for the floorboard panel forward of the rudder pedals to a sheet of .032.  We're also going to re-make the panel around the control sticks for easier removal so that was transferred as well.  Stacey laid out the cable guard cuts and bend lines on a sheet of .025.  All materials were 2024T3.

Filed under: Fuselage Leave a comment
Comments (0) Trackbacks (0)

No comments yet.


Leave a Reply

No trackbacks yet.