3Jun/104 hrs

Floor Trimming/Drilling, Prepared for Tech Counselor

Continued work on match drilling the floors occured tonight.  For the most part they are fitting fine, so far 2 have required some very minor trimming, probably because the factory happened to weld a little longer than anticipated.  I also trimmed the material out from around the control sticks so I don't have to remove them to remove the floor.

Tomorrow my EAA tech counselor is coming for a first visit so I spent some time preparing for that, mostly re-installing things I've already drilled/fitted but removed to do other things.   I put everything on the plane that I've started on so he can inspect.

Filed under: Fuselage Leave a comment
Comments (1) Trackbacks (0)
  1. Cool! Good luck with your EAA inspection!