bearhawkproject.com Matt Kunkel's Bearhawk Build Log

22Jun/101 hr

Elevator bellcrank spacer measurement, Cable routing

I dummied up the cable routing paths for the flaps and elevator with string and turnbuckle assemblies.  I measured for the spacers such that there isn't interference amongst the linkages.

Comments (0) Trackbacks (0)

No comments yet.


Leave a Reply

No trackbacks yet.