Began match drilling floors

After laying the floors into their locations, I placed weights and milk jugs full of cleco's on them to help them flatten out.  I adjusted each floorboard so it's centered on the tubes and has proper edge distances on the end holes.  I clamped each floorboard in place and drilled them one at a time securing each hole with a cleco.  Drilling began in the middle and systematically worked out alternating holes to eliminate any slack.  Serhat, a friend from work came to the hangar and poked cleco's in holes as I drilled them.